APC | Approach\Departure Control
1. Area of responsibility
1.1 If ILS 08 is in use, the "PIE" Area is also under the control of APP
1.2 If ILS--30\RNP-Z--30\RNP--26\ILS--26 and after coordination with PLUTO (LLPT_E), the sector below 6000 ft in the STAR+APP is under the control of BGN APC (further information about that in PLUTO LO)
1.3 When APC is divided into APP and DEP, the area of control is as published in the annexes and in the APC | GEN
2. Method of control
2.1 The APC controller will provide RADAR services to traffic in his Area of responsibility
2.2
3. Standing Agreements
3.3.2 Tel-Aviv (control)
3.3.2.1 From Ben Gurion to Tel-Aviv
STAR allocation: Tel Aviv control will allocate STAR to Ben Gurion.
Altitude agreement:
|
From |
Agreement |
Conditions |
|
LLBG SID |
β8000ft |
Clear of conflict |
Transfer of control:
|
Position |
Conditions |
|
Airborne passing 3500ft |
VIA SID |
3.3.2.2 From Tel-Aviv to Ben Gurion
Altitude agreement:
|
TO |
Agreement |
Conditions |
|
LLBG |
β5000ft |
RWY26/21/12/08 |
|
|
β6000ft |
RWY30 |
Transfer of control:
|
Position |
Conditions |
|
2NM before AMMOS |
RWY26/30/21 |
|
2NM before PURLA |
RWY08 |
|
2NM before NINET |
RWY12 |