Annex A - Airports
Chapter 1 Ben Gurion (LLBG)
1.1 Controller Positions and Coordination Indicator
|
RTF Callsign |
FREQ |
EuroScope Identifier |
Position Identifier |
|
Ben Gurion Approach |
120.500 |
BGD |
LLBG_D_APP |
|
Ben Gurion Approach |
131.100 |
BGA |
LLBG_A_APP |
|
Ben Gurion TMA |
119.500 |
BGT |
LLBG_T_APP |
|
Ben Gurion Tower |
134.600 |
BST |
LLBG_D_TWR |
|
Ben Gurion Tower |
132.100 |
BAT |
LLBG_A_TWR |
|
Ben Gurion West Ground |
121.750 |
BGW |
LLBG_W_GND |
|
Ben Gurion East Ground |
121.950 |
BGE |
LLBG_E_GND |
|
Ben Gurion Delivery |
118.300 |
DBG |
LLBG_DEL |
LLBG_D_APP will be the first to connect; if RWY 21 is in use, LLBG_A_APP can connect. and in the following priority are LLBG_T_APP.
LLBG_D_TWR will be the first to connect; if RWY 21 is in use, LLBG_A_TWR can connect.
LLBG_W_GND will be the first to connect; Then LLBG_E_GND, and after that LLBG_DEL.
1.2 Area of Responsibility
Ben Gurion control unit is covering for LLBG TMA and for the airspace delegated to it by the relevant ACC. The arrival controller shall sequence traffic from the release point until established on final approach. When online, the TMA controller shall assume responsibility for crossing traffic and VFR at the Herzelia CTR.
LLBG_D_TWR shall decide the runway configuration in use. Also, LLBG_D_APP shall decide the Approach in use.